Conceptual Design for a 4-Story Medical Building Addition

Recently, the Studio was asked to develop an exterior skin treatment for a 4-story addition/expansion to an existing medical building in Wisconsin. The new design was developed from minimal information provided by the architect, and adds 3 stories on top of an existing single story structure (the portion of the building under the linear canopy & colonnade). The design also includes an additional vertical circulation core, main entry, and function spaces.

The directive from Geometrik Studio's client was very specific regarding overall composition, as well as some of the architectural "features" that the architect wanted to directly relate to other projects built for the medical company that requested the proposal. The fenestration is dictated by the existing 1-story structure, so that the old and new would appear compositionally unified.



Marshfield Clinics in the News

Geometrik Studio's work on several projects for ADG Architects & Marshfield Clinics in central Wisconsin has been under the cloak of a nondisclosure agreement for many months now, but as the projects are revealed to the public, soon we'll be able to release renderings that were prepared for the client(s).

In the mean time, a cool aerial drone video of the Clinic has been posted by the general contractor, Market & Johnson:

https://www.youtube.com/watch?v=ic-KskdUKoY

Link Opens in a New Tab or Window.

Link Opens in a New Tab or Window.

Altoona Elementary School Design Unveiled...

Geometrik Studio's work as design consultant on the new elementary school in Altoona, Wisconsin was formally unveiled on March 16th.

Presented to the Altoona School District and the public by our long-time client Dave Cihasky of ADG Architects, the presentation renderings are now included in the Geometrik Studio Design Gallery.

 

Geometrik Studio Helps Win Project at Iowa State University.

One of the Studio's long-time clients has won the bid for a new Student Residence Facility at Iowa State University, in Ames, Iowa.

Opus AE Group's winning submission secured the highest architectural design score from the ISU selection committee for the proposed design. Geometrik Studio contributed visualization work that was included in both the printed bid package and oral presentation.

Initially, we were only asked to prepare the interior renderings, based on our ability to work with minimal information. Following the failure of another architectural rendering provider to deliver a presentable dusk/dawn "glamour shot" for the exterior we were asked to deliver that rendering, as well as several more exterior views.  The expanded scope certainly turned-up the heat a notch, but it feels good to get the call when there's a breakdown somewhere else in the pipeline  :-) 

School Design work wrapping-up...

Geometrik Studio's work on the exterior design concept has concluded, while our architectural partner moves forward with the next phase of project development.  Eventually, we'll probably be asked to take a look at the interior design.  For now, here's another view showing the predominant red accents requested by the School Board:

View of the Bus Drop-off & Entry, with main building Entrance Canopy in the distance.

View of the Bus Drop-off & Entry, with main building Entrance Canopy in the distance.

Elementary School: Design work progressing...

'Still can't reveal too much about the design yet, but the School District provided some good input during our meeting the other day.

Surprisingly, we were asked us to pursue one of the more interesting entry options we presented. They also asked for a more neutral brick palette, which really helps accentuate the red building accents.

The new proposed canopy design.

The new proposed canopy design.

New Work: Elementary School Design

Geometrik Studio has been contracted to develop an exterior design for a new elementary school in Wisconsin.

Here's a snippet - 'can't reveal the whole design yet...

View of one of the building entrances...

View of one of the building entrances...